1. RSC
2. spin flip: Rb with MW, Cs with Raman square pulse
3. ramp down traps, turn on B field to 210G
4. sweep 938 to 817 to merge (this sweep has variable duration)
5. ramp field to 196.4G 
6. apply RB1 pulse to eject GS atoms
6. ramp field back up
7. unmerge

Data from 08.06.2022

817 set H101.525 MHz throughout and V 98.425 MHz throughout
Traps are not overlapped, ~500nm between centres.
938 sweep has hybridicity 0.1.
817 1V=1.3mW, 938 3.5=6mWV for merging.
Measure26: vary 938 sweep duration


Data from 09.06.2022

Traps overlapped with 817 set H101.8 MHz throughout and V 98.325 MHz throughout.
Use RB1 pulse technique to optimise merging
Still using 938 power ramp down to 1.5V (in addition to AOD ramp) before association step
938 sweep has hybridicity 0.1.
817 1V=1.3mW, 938 3.5=6mWV for merging.
Measure25: vary 938 sweep duration


Data from 10.06.2022

Traps overlapped with 817 set H101.8 MHz throughout and V 98.325 MHz throughout.
Use RB1 pulse technique to optimise merging
938 sweep has duration 1ms
817 1V=1.3mW, 938 3.5=6mWV for merging.
Measure3: vary 938 hybridicity